Tuesday, November 30, 2010

Outside Work

After I don't know how many beautiful weekends spent working inside the new place, we decided that we should work on installing the fence on the coldest, windiest Saturday of the year so far. At least, that is how it seemed. Add to that the failure of the rental auger, and you have what might be termed an inauspicious start to a home improvement project. But, CPM and his crew are determined. The auger was exchanged for one that worked. The cold breeze was ignored. And a fence was mostly installed this past weekend. (Okay, there are still several panels and the gates to go in. It's 80 percent complete. Close enough.)

Lumberjacks!
2 Man Auger

Wow, the garage is really messy.
2 Man Auger

But the fence "look niiiice. I like."
Fence Installed

The stucco guy has also been hard at work. Soon the outside will look as nice as the inside.

Stucco repair in Progress

What's left to do inside the house is mostly finish work: installing wood trim, door jambs, window sills. We also must begin the nitty gritty of selecting tile, installing tile, putting in a REAL FLUSHING TOILET and FUNCTIONING SINK. Dear god, I can almost taste the anti-bacterial hand soap! I cannot wait to banish the porta potty from the drive way. CAN. NOT. WAIT. After that we need to pick a kitchen and some appliances. (Ikea? Maybe?). No biggie, right? This is never ending.

No comments:

Post a Comment